From city permit to PG&E meter in Cupertino
- City permit. Building permits go through Community Development (Building Division), using Accela Citizen Access, which issues instant permits for panel upgrades and temporary power poles up to 200A.
- PG&E application. The new service, upgrade or disconnect is a separate application to PG&E. A complete package the first time is what keeps it moving.
- PG&E design and scheduling. PG&E assigns a job owner, designs the service and schedules its crews. This is where most jobs stall without follow-up.
- City final and release. Cupertino uses an Electrical Meter Release / Gas Meter Release inspection. The inspector applies a meter release sticker for PG&E's field crew; without it, PG&E will not set the meter.
- Meter set. PG&E sets the meter and energizes once it has the release and its own work is done.
Cupertino rules that affect PG&E work
Undergrounding
The city's permit application calls for undergrounding all overhead utility service to a new house or a new electric panel. Code Chapter 14.24 also covers undergrounding for new developments.
Demolition
A demolition permit requires a utility letter confirming gas and electric are terminated at the main or street.
Electrification
The all-electric rule was repealed on October 1, 2024 and replaced by Ordinance 24-2265 energy-performance and electric-ready rules, in effect since April 2025.
What MeterSet handles in Cupertino
- New electric and gas service for new homes and rebuilds, from application to meter set
- Panel and service upgrades to 200A and 400A, including Express Connect where the job qualifies
- Temporary construction power
- Electric and gas disconnects and the PG&E letters your demolition permit needs
- Escalation when a PG&E date slips, measured against PG&E's own published timelines
Questions Cupertino builders ask
Can I pull a Cupertino panel upgrade or temp power permit online?
Yes. Cupertino's Accela Citizen Access issues instant permits for panel upgrades and temporary power poles up to 200A. The PG&E side is a separate application.
What is a meter release sticker in Cupertino?
At the electrical or gas meter release inspection, the inspector applies a sticker that tells PG&E's field crew the city has released the service.